Lennoxtown Site Feasibility

Client: East Dunbartonshire Council

Services: Site Assessment and Feasibility, Ecology, Flood Risk, Drainage, Landscape Masterplanning; park design; public realm; hard and soft landscape design; and play area design.

Special Considerations: Conservation Areas; Flood Risk; Ecology and Vandalism

Project Overview/ Summary:

Surface was commissioned to undertake a site feasibility assessment for two park regeneration schemes utilising findings from public consultation.  We prepared concept designs through to detailed design, incorporation of ecological and hydrology constraints, and included a capital cost and delivery program.

Projects